• Skip to secondary menu
  • Skip to main content
  • Skip to primary sidebar
  • About Us
  • Contact Us

RynoNet

Embarking on the Next Chapter. Follow along.

  • Home
  • This New House
  • This Old House

hvac

June 11 Brings HVAC and Pics of Plans Too

June 11, 2019 by Matt Ryan

Today’s visit brings good news on a few different fronts. There IS a pump in the basement and the floor is mostly dry. This is so good, especially considering that yesterday we had rather heavy rain much of the day. Looks like it stayed outside – where it is supposed to.

106-truman_20190611_bathroom-vent
106-truman_20190611_elec-meter
106-truman_20190611_furnace-island
106-truman_20190611_main-hvac-ducts

The basement has a brand new furnace sitting in its belly. There is duct work running to a variety of rooms. Vents in the bathrooms, returns in the hallways. All very cool for me.

The electric meter is attached to the wall outside and there’s a number of new protrusions coming out of the house.

I grabbed a few more pics of the building plans.

106-truman_20190611_171547348
106-truman_20190611_171709013
106-truman_20190611_171719762
106-truman_20190611_171731943
106-truman_20190611_171747673

Enjoy, and if you are so inclined, check out the full set of pics I grabbed today using this link to Amazon Photos.

Filed Under: This New House Tagged With: flooding, hvac, plans

June 8 A Day For Exploring

June 8, 2019 by Matt Ryan

It’s late in the afternoon on Saturday. Carol and I spent the morning hauling a ton, well, to be precise, 490 lbs, of household excess and leftover stuff, to the LanChester Landfill. Carol’s first experience with the dump. We both found it somewhat cathartic throwing old stuff into the big bins. So much of the stuff we tossed was actually inherited when we bought This Old House back in 2007. I vowed NOT to move it into our new house.

We had to grab a quick selfie in front of our blossoming home.

Our home has a door!

It was time to explore the framed out rooms in our home. We wandered through the entire place, grabbing pics along the way. I even grabbed some photos of the building plans that were lying in the garage. The electrical and plumbing schedules are sure to come in handy at some point.

106-truman_20190608_dining-area
106-truman_20190608_flooded-basement
106-truman_20190608_flooded-basement-west
106-truman_20190608_from-hallway
106-truman_20190608_mbr-2-kitchen
106-truman_20190608_office-looking-through-kit

We did find one disturbing thing. The basement had about 2″ of water in it! Our guess is that this was from the heavy rains we had earlier that week – before the roofing was installed. Hopefully the next time we visit there will be a pump running.

Here is the link to the rest of today’s story.

Thanks for reading along.

Filed Under: This New House Tagged With: flooding, framing, hvac

Primary Sidebar

Countdown to
The New House

Subscribe

Subscribe to our site and get notified when new stuff is added.
  • This field is for validation purposes and should be left unchanged.

That’s all there is to it. Unsubscribe anytime. No worries.


Grass Cutting Countdown

It's no more!

Connect With Us Online

  • Facebook
  • Instagram
  • Pinterest
  • Twitter

A Little About Matt & Carol

Nothing yet, but soon.

My sons are grown and have moved out on their own. My husband is his own boss in a growing business he has created. So now it is my time to pursue my creativity, a revival of the things that brings me happiness, to create. To create whatever my mind can imagine. I can sew, glue, cut, color, twist, paint, nail things and so much more.

Powered by

Looking for anything?

Copyright © 2021 · Lifestyle Pro Theme on Genesis Framework · WordPress · Log in